CNG Fuels station Warrington
hydrogen-icon

Hydrogen Trials

CNG Fuels will conduct on site trials and rollout hydrogen and electric capabilities at its stations as the technologies prove their viability

FIND OUT MORE
CNG Fuels Station

A combination of six production configurations are being trialled for scalability and future economic viability

A combination of six production configurations are being trialled for scalability and future economic viability

CNG Fuels is uniquely positioned to facilitate our customers’ journey to net zero emissions. The company intends to facilitate the trials of multiple hydrogen pathways for delivery to trucks on site, including:

  • Delivery via trailer of hydrogen from SMR (blue) and electrolysis (green) from offsite production
  • Production and delivery of small scale hydrogen on site from SMR and Electrolysis
  • Delivery of hydrogen (100% or blended with methane) via pipeline directly to site

6 PRODUCTION OPTIONS

3x

On-site, off-site and off-shore electrolysis

2x

SMR and ATR + GHR with ccs

1x

Waste gasification + CCS

CNG Fuels future fuels
CNG Fuels future fuels